Culture Arena

Sweden · Art & Architecture · Hard

The Öresund Bridge, connecting Sweden to Denmark, was completed in which year and combines what two transport modes?

Answer: 2000; road and rail — The Öresund Bridge, an engineering and architectural landmark completed in 2000, carries both a four-lane motorway and a double-track railway across the strait.

The Öresund Bridge, an engineering and architectural landmark completed in 2000, carries both a four-lane motorway and a double-track railway across the strait.

Play Sweden · Art & Architecture